​​The main elements of the facilities already in operation are:

  • Diversified gas s​upply (Associated Gas and Non-Associated Gas) and six main dedicated gas transmission pipelines with four of them located on-shore
  • Six LNG processing units (trains) with a total nameplate processing capacity of 22 mtpa.
  • Four LNG storage tanks, each with a capacity of 84,200 cubic metres.
  • Four LPG refrigerated storage tanks, each with a capacity of 65,000 cubic metres (two each for propane and butane).
  • Three Condensate storage tanks, each with a capacity of 36,000 cubic metres.
  • A common fractionation plant to process LPG.
  • Five common Condensate stabilisation plants.
  • 10 gas turbine electricity generators with a combined capacity of more than 320 MW.
  • Two LNG export jetties, one of which also exports LPG while the other also exports Condensate, with a combined capacity of more than 400 loadings per year.
  • 23 LNG ships dedicated to the service of NLNG.
  • A materials off-loading jetty.
  • A passenger jetty/terminal.


​​






​​